Water Cooling Mining Container 1.6MW Water
HomeHome > Products > Whatsminer > Water Cooling Mining Container 1.6MW Water
Water Cooling Mining Container 1.6MW Water

Water Cooling Mining Container 1.6MW Water

Water Cooling Mining Container 1.6MW Water-cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 series heat dissipatio
Basic Info.
Model NO. Mining Container
Memory Bus 256 Bit
Bus Standard PCI Express 2.0
Heat Dispatch Method Fan HeatSink
3D API DirectX 10.1
Dimensions (L*W*H), mm 6058*2438*2896
Wet Bulb Temperature 28
Ambient Temperature and Humidity 35, 60%Rh
Heat Dissipation Capacity 1600kw, Reserve 10% Margin
Product Water Cooling Mining Container
Transport Package Firm and Strong
Specification 2043*2610*755
Trademark other
Origin China
HS Code 8471800000
Production Capacity 50000
Product Description
Water Cooling Mining Container 1.6MW Water-cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 series
heat dissipation capacity: 1600KW, reserve 10% margin
Dimensions (L*W*H), mm: 6058*2438*2896
Ambient temperature and humidity: 35ºC,60%RH
Wet bulb temperature: 28ºC
Cooling tower inlet and outlet water temperature : 35ºCCooling tower inlet 45°C, cooling tower outlet 35°C
flow: 180m³/h
Fan air volume: 75000m³/h*4
Fan power: 7.5KW*4
Spray pump flow: 233m³/h
Spray pump power: 5.5KW
Motor voltage: 380V/50Hz
water consumption :Maximum 1~1.5m³/h
Sprinkler pipe material:304 Stainless steel
304 stainless steel tube + aluminum fins
Weight (shipping weight/running weight): 6/10 ton
noise(16m): maximum 75dBA
External piping specifications : DN150,DN40,DN65 Circulating water pipe DN150, make-up water pipe DN40, drain pipe DN65
design pressure: 1.2Mpa
flow resistance loss: 80KPa
total power: 25KW(max35KW)
Details for Water Cooling Mining Container 1.6MW Water-cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 series
Product typeWater Cooling Mining Container
heat dissipation capacity1600KW
Motor voltage380V/50Hz
water consumptionMaximum 1~1.5m³/h
Sprinkler pipe material304 Stainless steel
Ambient temperature and humidity35ºC,60%RH
design pressure1.2Mpa
noise(16m)maximum 75dBA
total power25KW(max35KW)

Pictures for Water Cooling Mining Container 1.6MW Water-cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 series

Water Cooling Mining Container 1.6MW Water-Cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 Series

Water Cooling Mining Container 1.6MW Water-Cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 Series

Water Cooling Mining Container 1.6MW Water-Cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 Series

Water Cooling Mining Container 1.6MW Water-Cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 Series

Water Cooling Mining Container 1.6MW Water-Cooled Cabinet for Whatsminer M20 M30 M50 Antminer S19 Series


We have all types of Asic /GPU /HDD Mining Machine and related components, such as the models as below on hot selling always:
Brand New Antminer S19J 90T / S19 95T / S19J Pro 96T / S19J Pro 100T / S19J Pro 104T /S19 Pro 110T / L7 / T19 /DR5 / Z15 / S19 XP / KA3
Brand New Avalon A1166 pro / Avalon A1246 / Avalon A1126 pro
Brand New Goldshell CK5 / HS5 / LT5 Pro
Brand New Whatsminer M31S / M20S
Innosilicon T2T / L3+
GPU : M08S , M06S Mining Rig
HDD Mining Rig
Graphic Cards: 220HX , 170HX, 90HX , 70HX, RX580 , RX590, RTX 3060, RTX 3060TI, RTX 3070 , RTX 3080 ,RTX 3090 , RX 5700 XT ,6700XT , 6800XT and so on
Safely Box for each machine and test correctly before shipping out to make all customers get working items.
Welcome to contact us and have a nice shopping time :) :)
We Promise:
1. 100% Guaranteed original new
2. 100% Guaranteed fast shipping
3. 100% Guaranteed lowest price
Packaging
1. Packaging Details: Carton Packing; One Machine Per Carton
2. Delivery Details: UPS, DHL, FedEx, EMS, TNT
3. Port: Shenzhen / Hong Kong
4. Lead Time: in 2 days after payment
5. If your shipment is not received within 30 days after payment, please contact us. We will track the shipment and get back to you as soon as possible.
Delivery
1.Express: UPS, DHL, FEDEX, TNT or Special Express Line.
2.Air way shipping, sea way shipping and other shipping ways are available.
3.1-10pcs will be delivered within 2-3 working days after the receipt of payment.
4. For order over 200pcs, lead time will be 7-15 working days after the receipt of payment.